MartinAI
Energy data · New Brunswick

Energy Data and Utility Bill Audit in Dieppe

Utility data delivery, bill audit, and emissions reporting for Dieppe, New Brunswick. From messy bills to structured, validated records you can trust.

330 g
CO2e per kWh on the local grid
Every
commodity and bill format, read and validated
Audit
ready records for cost, benchmarking, and emissions

Every building in Dieppe generates a steady stream of utility bills across electricity, natural gas, water, and sometimes steam or district energy. Read one at a time, they are just paper. Assembled, validated, and understood, they are the clearest record of how a building actually performs. Diversified around forestry and pulp and paper, energy including the Irving Oil refinery at Saint John, agriculture, food processing and manufacturing. As a city in Canada, Dieppe has its own utilities, regulator, and reporting rules, and this page covers what that means for your data.

The energy picture in Dieppe

Grid carbon intensityabout 330 g CO2e/kWh (2022)
Grid mixNuclear from Point Lepreau about 40 percent, fossil fuels (natural gas, coal and petroleum) about 27 percent, hydro about 23 percent, wind about 6 percent and biomass about 5 percent in 2021. Grid intensity was 330 g CO2e per kWh in 2022, moderate for Canada, with coal generation targeted for phase-out by 2030.
Main electricity utilitiesNB Power, Saint John Energy, Edmundston Energy, and Perth-Andover Electric Light Commission
Main gas utilitiesLiberty Utilities (Enbridge Gas New Brunswick)
Energy regulatorNew Brunswick Energy and Utilities Board
What the grid means for emissions

Dieppe draws from the New Brunswick grid, so its electricity carbon intensity reflects that grid. At about 330 grams of CO2e per kilowatt-hour (2022), electricity here carries a middling carbon intensity. Both electricity and fuel reductions move the number, which makes accurate, commodity-by-commodity data the difference between a defensible emissions figure and a guess.

On the ground in Dieppe

  • Electricity is delivered locally by NB Power, within the New Brunswick Energy and Utilities Board framework.
  • Part of Greater Moncton.

Getting your utility data in Dieppe

NB Power provides billing and usage history through its online customer account following a province-wide advanced metering rollout; a standardized Green Button export is not currently published (https://www.nbpower.com).

What MartinAI delivers in Dieppe

Whether a building is served by NB Power, Saint John Energy, and Edmundston Energy, or any other provider, the bills arrive in different formats and units. MartinAI reads them all, normalizes units and billing periods, flags estimated reads and gaps, and produces a consistent record you can compare across sites and months.

01

Data delivery

Every utility bill read across electricity, gas, water, steam, and fuels, normalized to consistent units and periods.

02

Bill audit

Rate class, demand, tax, and meter mapping checked against the tariff and the meter to recover overcharges.

03

Benchmarking

Clean records that feed ENERGY STAR Portfolio Manager and internal intensity comparisons across sites.

04

Emissions reporting

Consumption paired with the right local emission factor for defensible Scope 1 and Scope 2 numbers.

Utility bill audit in Dieppe

Utility bills carry errors more often than most teams expect. Independent figures put billing mistakes at 2.5 to 10 percent of spend and estimate that 15 to 20 percent of invoices contain errors. A bill audit in Dieppe means checking rate classes, demand charges, tax treatment, and meter mapping against what the tariff and the meter actually say, then recovering what was overpaid.

Reporting and compliance in New Brunswick

No provincial mandatory building energy benchmarking or disclosure requirement is in force. Reporting is voluntary through NRCan's ENERGY STAR Portfolio Manager, while federal direction comes from the Canadian Sustainability Disclosure Standards (CSDS) issued by the Canadian Sustainability Standards Board and OSFI's Guideline B-15 for federally regulated financial institutions.

Frequently asked questions

Can MartinAI handle utility bills from Dieppe and New Brunswick?

Yes. MartinAI reads utility bills across every commodity (electricity, natural gas, water, steam, and fuels) and every layout used by utilities in New Brunswick, then validates each figure. Local formats and multi-meter accounts are exactly what it is built for.

What is the grid carbon intensity in Dieppe?

Grid electricity in Dieppe, which sits on the New Brunswick grid, is about 330 grams of CO2e per kilowatt-hour (2022). MartinAI pairs your validated consumption with the right local emission factor so your Scope 2 numbers are accurate.

Do you help with energy reporting rules in New Brunswick?

No provincial mandatory building energy benchmarking or disclosure requirement is in force. Reporting is voluntary through NRCan's ENERGY STAR Portfolio Manager, while federal direction comes from the Canadian Sustainability Disclosure Standards (CSDS) issued by the Canadian Sustainability Standards Board and OSFI's Guideline B-15 for federally regulated financial institutions. MartinAI produces the clean, traceable data those reports depend on.

How is this different from reading bills by hand?

Manual entry is slow and error prone, and the errors flow straight into your cost and emissions numbers. MartinAI reads and validates automatically, flags anomalies, and keeps every figure traceable back to the source bill, so the data holds up under an audit.